Captain Pile Method

A method that allows the designers to adjust the bonding state (fastening degree) of cast-in-place pile and foundation

Outline of the
construction method

Since stress generated on the pile head at the time of earthquake will be less, this method can reduce damage to the pile materials. The shear strength from the upper structure, which is generated at the time of earthquake, is transferred to the piles via a PC ring and by allocation of tension anchor reinforcement, and this method can deal with the pulling force generated on the piles. The captain pile method is easy to design and perform and is also superior in terms of cost performance.

imgimg

Characteristics of the
construction method

Improve quake resistance

Semirigid connection of piles and foundation can contribute to reducing bending moment of piles and footing beam and resulting damage at the time of earthquake.

Streamline foundation

Thanks to the reduction of bending moment of pile head, this method can (1) shorten pile diameter, (2) downsize the footing beam, and (3) reduce the amount of excavated soil, allowing for cost reduction and shorter work period.

Improve workability and quality

Since there is no anchor reinforcement for the pile, pile head can be easily shaved, thus damages on reinforcing steels can be prevented. Thanks to the simple design of the joined section of pile head, which only needs PC ring placed onto it, workability and quality is increased.

Scope of application

This method can be applied regardless of the usage of building and structure type.
The applicable pile type is the cast-in-place concrete pile. (Pile diameter 800φ to 3000φ)

Our Works

  • imgimg
    Name
    (Provisional name) Plan in Hakusan 1, Bunkyo-ku
    Location
    Bunkyo-ku, Tokyo
    Construction period
    November 2015 to August 2017
    Structure
    RC, 8 floors above ground, Apartment building
    Pile diameter
    φ1500 to φ1400
    Pile length
    29.5m
  • imgimg
    Name
    Proud Chiyoda Awajicho
    Construction Technology
    Captain Pile Method
    Construction site
    the Tokyo Metropolitan Government
    Client
    Sumitomo Realty & Development Co., Ltd.
  • imgimg
    Name
    (Provisional name)New planned construction in Shinohashi 2
    Construction Technology
    Captain Pile Method
    Construction site
    the Tokyo Metropolitan Government
    Client
    Sumitomo Realty & Development Co.,Ltd.